-
Hinge pin assembly sequence - where does the @#$%& spring go?
I'm trying to re-hang the doors on my '66 series IIA.
The green bible (and the hayes manuals) illustrations all show the bronze ball and spring held in between the two hinge halves.
So the sequence goes
A. Bolt through top hinge
B. Bronze pivot ball
C. Spring
D. Lower hinge half
E. tabbed, slotted washer
F. Nut
Izzat the way it's really supposed to go? Where the spring sits in the lower socket and holds the bronze ball against the upper hinge half? The door wants to sit a half an inch proud and I can't pull it down (compress the springs) enough to get the lock washer on the bolt.
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules