Does anyone have installation instructions for the deployable side steps? Thanks in advance.
Deployable side steps
Collapse
X
-
Deployable side steps
1958 Series 1 88"
1966 Series 2A 88"
1975 Sereies 3 109" Carmichael Fire TruckTags: None -
they are assembled off the car, then they mount on the existing holes on the inside of the rocker pannel, these are covered by round pieces of what looks like duct tape... the motor connector is existant on the car, the installation is plug and play down to the roof mounted manual activation button.
here is the fun part, you need to programm and activate the module using test book or a similar land rover diagnosis tool/ scanner. -
Thanks, Phoenix. Where is the pass through to vehicle interior to feed wiring and where is the plug in? I'm guessing the back near spare tire, through same hole as trailer plug? For ceiling switch, do you have to run wiring down pillar?1958 Series 1 88"
1966 Series 2A 88"
1975 Sereies 3 109" Carmichael Fire TruckComment
Comment