Hi all,

So I'm about to get my parts back from the chemical stripper and as expected both door frames split in half at the rear column where sever corrosion had occured. I need to take them over to a welder to get them fixed up. BUT I failed to take measurements before hand (duh) and now desperately need them. Can anyone tell me what A, B, and C are so that the welder puts this together perfectly?

Thanks!