Hi all,
So I'm about to get my parts back from the chemical stripper and as expected both door frames split in half at the rear column where sever corrosion had occured. I need to take them over to a welder to get them fixed up. BUT I failed to take measurements before hand (duh) and now desperately need them. Can anyone tell me what A, B, and C are so that the welder puts this together perfectly?
Thanks!
So I'm about to get my parts back from the chemical stripper and as expected both door frames split in half at the rear column where sever corrosion had occured. I need to take them over to a welder to get them fixed up. BUT I failed to take measurements before hand (duh) and now desperately need them. Can anyone tell me what A, B, and C are so that the welder puts this together perfectly?
Thanks!
Comment