Originally posted by jac04
Got My Lightweight!! Stay Tuned for Project Updates and Plenty of Questions!
Collapse
X
-
--Mark
1973 SIII 109 RHD 2.5NA Diesel
0-54mph in just under 11.5 minutes
(9.7 minutes now that she's a 3-door). -
^^ Nope, it's not you, it is installed the other way. All the reference info I have shows the valve installed the way it is in the "after" photo. It's hard to tell if the valve was ever removed before, so I don't know if it was installed correctly in the "before" photo. Maybe someone else with a military vehicle can take a look at their valve and see how it is.Comment
-
My RHD 12v Lightweight has it on the right seat box.Comment
-
Jac, Looks like you are doing it right. I check in regularly on your progress. I am in the final stages of a frame replacement on my Lightweight. Drop me an E-Mail if you have any questions. jamet07@hotmail.comComment
-
^^What did you do about the shims used between the rear tub and the chassis? Mine had shims, but they basically disintegrated when I took the rear tub off. I was going to make some up if needed, but I'm wondering what to expect as far as alignment issues.Comment
-
The ones that I had were in decent shape so I cleaned them up and painted them w/POR 15. I haven't done a final fit on the tub yet because my doors arent quite finished so I havent used them yet. As far as yours disintegrating I don't think they would be too hard to make. If you need one for a pattern I can send you one. I would definitely use a differant material though.Comment
Comment